Our Practice Engineering Services Engineering Portfolio Interface Engineering News Careers Contacts
Portfolio Home
- Commercial
- Institutional
- International
- Retail
- Residential
- Industrial
- Health Care
- Educational
- Cultural
- Green Building
New Book
New Book on Green Building Breakthrough:
Platinum LEED on a Conventional Budget

New BookCheck out IE’s pioneering work in this complimentary, illustrated 48-page book.
Download (PDF 5MB) »
Learn More »
   
Engineering Portfolio

Educational Engineering Projects

 

Western Washington University


Western Washington University

Bellingham, Washington

Computer Center
This project consisted of installing media teaching technologies in ten to fourteen classrooms on WWU’s main campus in Bellingham.  The overall design of both the physical renovation and the media installation were very similar for all of the individual classrooms involved in this renovation.  A single room design was applied to all the rooms as a template, with the detailed design designating variations as applicable to individual classrooms.

Fine Arts Building and Annex
The ventilation system in the art annex and certain spaces in the fine arts building were upgraded to provide the proper ventilation for occupants and the proper make-up air for all exhaust systems in the spaces.  The spaces included classrooms, a metal working lab, a wood working lab, a ceramics lab, clay mixing room, an art room, and a classroom studio. Because of the diversity of spaces, make-up air was provided by individual air handling units for each space.  The units were interlocked to operate with the room exhaust systems.  Make-up air was heated by the building’s existing hot water system.

OT Emergency Telephones
This project consisted of project management and design for the installation of self-contained cellular emergency telephones, to be connected to an existing monitoring system and local cellular telephone services.  These phones are located in six exterior locations throughout the university campus.  Each location is equipped with a cellular emergency phone, a fluorescent lighting fixture to indicate location, a strobe light fixture to indicate that the phone is in operation, equipment mounting assemblies, signage, and electrical power to operate the phones and lighting fixtures.

« back to educational engineering projects home

 
Educational Engineering
Portland State University - Helen Gordon Child Development Center
Salem-Keizer School District - Salem, OR
George W. Bush Elementary School ­ Stockton, CA
Western Washington University - Bellingham, Washington
Portland State University, Stephen E. Epler Hall – Portland, OR
 

503.382.2266   ·