Our Practice Engineering Services Engineering Portfolio Interface Engineering News Careers Contacts
Portfolio Home
- Commercial
- Institutional
- International
- Retail
- Residential
- Industrial
- Health Care
- Educational
- Cultural
- Green Building
New Book
New Book on Green Building Breakthrough:
Platinum LEED on a Conventional Budget

New BookCheck out IE’s pioneering work in this complimentary, illustrated 48-page book.
Download (PDF 5MB) »
Learn More »
   
Engineering Portfolio

Industrial Engineering Projects

 

Bacon Pump Station


Bacon Pump Station

Folsom, California

For this project, Interface provided electrical and instrumentation design associated with a major renovation of an existing water booster pumping station. The existing eight-pump (2-200 HP, 6-100 HP) system served three pressure zones. The pumps were used in a single pumping scheme that boosted water pressure associated with the three pumping zone. Improved pressure zone control, improved energy usage, and additional pumping capacity were project goals. The existing pumping station had to remain in service during the construction phase. This required a staged approach to construction, including combined pressure zone operations. A fourteen-pump (5-200HP, 2-100HP, 3-75HP, 4-30HP) system was developed to replace the existing pumping system. The new pumping system consists of both new and existing pumps (2-200 HP and 2-100 HP) to achieve an economical design and to allow for the staged construction.  Much of the existing electrical switchgear was reconfigured and reused. The existing pumping station was powered by two utility services. Two emergency generators were installed to provide back-up power.  The existing PLC system and control strategies were replaced with a new PLC system and enhanced control strategies.  A combination of Full Voltage, Reduced Voltage and VFD based motor starting techniques were utilized for motor control.  Control and monitoring functions of the new system were integrated with the existing SCADA system.

« back to industrial engineering projects home

 
Industrial Engineering
Pueblo West Water/Water Treatment Plant ­ West Pueblo, CO
Thunder Valley Station Casino Water & Wastewater Treatment Facilities - Placer County, CA
Bacon Pump Station - Folsom, CA
Sun MicroSystems ­ Hillsboro, OR
Precision Interconnect - Wilsonville, OR
 