Testimonials
Note: Case studies relating to these testimonials are linked in orange.
Clackamas High School
Dave Church, Physical Plant Director, North Clackamas School District
“I’m very impressed with the lighting layout and quality of lighting. The lighting control system will be a real bonus to us in both energy savings and convenience of operation.”
Courthouse
Square Transit Center
Billy Wasson, Project Manager, Marion County
“The county was very satisfied with Interface’s services. Each time we had an engineering issue come up, they were very responsive and gave answers in layman’s terms.”
Department of Human Services Building
Mike Shea, Architect, Fletcher Farr Ayotte PC
“By using displacement ventilation and daylighting systems in this building, Interface was successful in maximizing employee comfort and productivity for our client.”
EcoTrust Jean Vollum Natural Capital Center, Building Renovation
Christine Ervin, President/CEO, US Green Building Council
“The Natural Capital Center proves that we can create a healthier brand of architecture that also is an outstanding example of beauty and historical integrity.”
InFocus Corporation Headquarters
Sharon Hayes, Real Estate Manager, InFocus Corporation
“Our employees are much more accepting of the space since they had so much input. We’re very happy with our building, and feel very fortunate to have had such an excellent design team.”
ODS Health Plans Milwaukie Plaza
David Shaffer, CFM, Facilities Manager, ODS Health Plans
“The (open air) design concept definitely added challenges to this project. The design of the visible components exceeded our expectations and was well done.”
Sun Microsystems Assembly Testing Facility
Peter Lehmann, Process Engineering Manager, Sun Microsystems
“Well into the project, Sun determined that the design incorporate future needs to ‘upsize’ the system by as much as 25%. Interface was able to accommodate the request and still keep the project on time and within budget.”
Tyco Precision Interconnect
Helen Ngo, Process Engineer, Tyco Precision Interconnect
“Now that we have a system that gives us twice the production capacity, we can achieve a return on our investment in this machine in no time.”
Art Higgins, HVAC/Electrical Lead, Evergreen School District
“Interface and the Evergreen School District
have worked together on numerous school projects which
have required a variety of designs for new and remodeled
elementary, junior high and high school buildings.
I have found Interface to be professional in every
aspect of their work and have appreciated having the
full scope of engineering services available to us
in one firm.”
Andrew Golay, Facilities Manager, Oregon Youth Authority
“The drawings were clear and complete and we had no change orders resulting from unclear or incomplete design information…Thanks for your professional effort. We intend to use your firm on similar projects in the future.”
Hans Ettlin, Partner, Peck Smiley Ettlin Architects
“Interface has been around for a long time and has a lot of integrity, plus they are highly competitive fee-wise. We’ve tried other firms, but ended up going back to them. The personalized attention makes all the difference.”
Jeffrey P. Reaves, AIA, President,
Group Mackenzie
“Group Mackenzie and Interface have worked together for more than 20 years on more than 300 projects of various types. The relationship we have established has been built with a strong sense of value and trust. This value and trust is proven by the long list of repeat, satisfied clients.”
Jerry W. Milstead, President, Milstead & Associates, Inc.
“I have found that Interface personnel respond quickly and efficiently to problems and concerns, and also give constant attention to schedule and budget.”
Thomas O. Olsen, Administrator, Terwilliger Plaza
”We have found Interface to be professional in every aspect of their work. They have recognized our needs to develop a project solution within our financial constraints, and completed their work on schedule and within budget.”
|