Skip to content
Bruce Damonte

Confidential High-Tech Campus

A high-performance, mass timber corporate campus that combines extensive renovation, new construction, and advanced sustainability systems to create a highly efficient workplace, research, and amenity-focused environment.

Mountain View, California

Architect: WRNS Studio

Building Size: 640,000 sf

Certifications: Zero Carbon Ready; LEED Platinum certified, LBC Water Petal, + WELL Building Certification Goals


This new Campus included five major elements:

Renovation of existing buildings – 187,000 sf
Addition of new Central Utility Plant – 12,000 sf
Construction of new building – 436,400 sf
Construction of new parking garage – 323,600 sf and 925 stalls
Demolition of existing buildings - Buildings 1, 3, and 4

Spaces in the new Campus include: Employee office spaces, software and hardware labs, amenities such as a conference center, company store, fitness center and a cafeteria. The project was the largest cross laminated timber structure at the time when it was built.

Sustainable features include:

  • Heat recovery energy hydronic loop to serve entire campus
  • Heat recovery heat pumps to provide heating hot water and chilled water without the use of gas or combustion
  • Engineered natural ventilation for economizer and night flush
  • Energy recovery mechanical ventilation system
  • Blackwater water recycling treatment system
  • Radiant slab systems
  • Radiant ceiling systems
  • VAV systems



WRNS Studio
Bruce Damonte
University of Hawai’i Manoa Utility Master Plan

Honolulu, Hawaii

Port of Portland Airport: Terminal Balancing and Concourse E Expansion

Portland, Oregon